
Currency
$50
Crypto
859.52 K Invastor Coins (INV)
Sold By: Thynk
Oracle's Primavera P6 product is one of the best, most powerful, most reliable project management, design and implementation programs. This software is a perfect solution for managing projects and designs in any size and size and with any degree of difficulty.
Condition: New
Ships From: Brockton, Massachusetts, United States
Delivery Options: Local Pickup- Free Shipping

Primavera P6 Professional 2022 v21.12 For Windows

Primavera P6 software is also used to schedule and control various projects. In construction, industrial and software projects where various activities are carried out on a regular basis, this software can also be used to schedule and control the project and to estimate the cost of those projects.
Features of Primavera P6 Software :
📌 Having a proper environment for updating and comparing expected and actual status
📌 Group projects
📌 Definition of Work Breakdown Structure (WBS)
📌 Defining and assigning work calendars
📌 Filter and Organize
📌 Updating
📌 Earned Value Indicators
📌 Reporting
📌 Make global changes or Global Chang
📌 Network Definition of Activities
📌 Defining time constraints (Constraint)
📌 Definition, allocation and leveling of resources
📌 Assigning Resource Curve
📌 Defining and allocating inflation at the expense of resource use
📌 Hammok and WBS activities.
System Requirements :
📌 Windows XP Professional / Vista / 7 / 8.1 / 10
📌 Pentium 1 GHz or higher
📌 512 MB of RAM
📌 500 MB of free hard-disk space
📌 Internet Explorer 5.5 SP2 or higher